An order runs in nine steps, and at each one you receive something in hand.
1. Tech pack: a numbered query list and a feasibility note, within one business day.
2. Costing and factory match: a costing breakdown and the proposed factory, with its current audit status and report date.
3. Sampling: a photographed sample review and the full comment history per style.
4. Pre-production: a PP approval pack with lab dip and trim approvals dated.
5. Inline production: a daily production report — plus an exception the day the calendar slips, not at the next report.
6. Pre-final inspection: a pre-final assessment report with photo evidence, the defects found and the rework agreed.
7. Final inspection: an inspection report with photo evidence and the measurement record.
8. Test reporting and quality documentation: the lab test reports and the quality document pack, on the style's record before shipment.
9. Shipment and documents: CI, PL, BL, COO and the full pack; ETD confirmed.